It’s the latest addition to the WERENT fleet. Called the Palfinger P1000 it’s the second model of this type of vehicle that we’ve purchased and joins the Wumag 1000, available […]
Read more
It’s the latest addition to the WERENT fleet. Called the Palfinger P1000 it’s the second model of this type of vehicle that we’ve purchased and joins the Wumag 1000, available […]
Read more
Two Genie® SX™-180 boom lifts involved in a high-precision demolition process. Since its partial collapse last year, concerns about the stability of the Polcevera Viaduct (better known as Ponte Morandi), […]
Read more
Skills, competence and professionalism, our keys to success Training is the primary strategic element of WERENT’s company development policy, which is systematically implemented using continuously evolving training methods and tools, […]
Read more
The growing demand for the rental of aerial platforms, telescopic handlers and excavator equipment, associated at the same time with sales and technical assistance, led WERENT to consolidate its presence […]
Read more
A team of about 15 men was necessary for a complex exceptional transport operation. This involved the handling of two boilers (13.20 x 6.00 x 5.50) each weighing in at […]
Read more
Nine months of planning for an exceptional transport of 189 km in total on public road. It was a 420 ton carbamate condenser, which left last December 20 from Terno […]
Read more
Not only was this one of the most complex handling operations we have ever performed, but it also involved a large number of the MARRAFFA team from both the Martina […]
Read more
In 1977, the Italian state TV channel, Rai, officially began its colour television broadcasts after several years of experimentation. It was the era of ideas and experimentation, and a time […]
Read moreHere at MARRAFFA Quality and Safety are two fixed constants. Following certification of the Quality Management System in accordance with ISO 9001:2008, we were also awarded the BH OHSAS 18001 […]
Read more
MARRAFFA rose to the challenge. The merit lies in meticulous preparation by our team and the use of an appropriate fleet of vehicles. Two abnormally large boilers (10.80 x 8.22 […]
Read more